
Testing a whole house before a full remodel
Example project
- Home
- 1960s single-story stucco house in West Dublin, on a sloping lot with a dry garden
- Original request
- New kitchen and bathrooms, smooth ceilings and a sliding door cut into the back wall
- Testing
- About 14 samples from the ceilings, wall texture, flooring, ducts and stucco
- Found
- Asbestos in the living room and hall ceiling texture and in the kitchen sheet vinyl
- Clear
- No asbestos in the wall texture, ducts or stucco
- Timeline
- Report ready about a week after the visit
- Estimated survey cost
- $1,300
In this example, the owners of a 1960s house in West Dublin are planning a remodel of most of the house. For a house, the air district asks for a lab test of five kinds of material before they are disturbed: ducts, acoustic ceilings, textured walls, stucco and floors. The owners have them all tested in one visit.






